Erection

Erection of pre-engineered buildings and steel structure is the last step in our building process that all the components from the previous steps come together.

 

General Rules

  • Build column combing with purlins (if any), brace column together. Then, continue building rafters after adjusting column.

  • Install the inside truss frames, and then proceed to erect the outside ones (according to the movement of truck crane – see the enclosed construction drawing)

  • Begin erecting from the braced bay.

  • Settle two construction frames at the braced position before placing new frame. This process is translated for the next frame.

  • Have to have temporary brace during the erection process. Use purlins with the bracing cable to locate, and link all the rafter frames.

  • Erect steel panel after adjusting rafter frame and straight purlin, clean up, and paint all scratches on the rafter and purlin.

  • Use chalks or stretch attached wires to locate or mark axis positions in order to balance the steel panel when to complete the covering.

  • Set foot on the bottom waves when walking on the roof. Steel panel may be crashed if stepping on the high waves, which can cause deformation or leaking.

  • Do not walk on bright panels.

 

Erection Steps

Step 1: Prepare before erection

Check the erection equipment, and materials, including: quantity, safety, quality…


Step 2: Erect column

Prepare-Erection.png-300x197.jpg
Prepare-Erection-1-300x198.jpg
Prepare-Erection-2-300x230.jpg
Step 3: Erect rafter
Erection-rafter1-300x197.jpg
Erection-rafter-1-300x196.jpg
Erection-rafter-2-300x198.jpg


Step 4: Erect purlin, and brace
 

Step 5: Calibrate the first frame

Erection-purlin-bracing-300x198.jpg
Erection-purlin-bracing-1-300x194.jpg
Calibration-the-first-frame-2-300x225.jpg

Step 6: Erect next frame
 

Step 7: Complete installation for the rest frame

​

Step 8: Erect roof monitor

Erection-next-frame-1024x768.jpg
Complete-others-frame-300x225.jpg
Erection-monitor-225x300.jpg

Step 9: Check completion before covering

​

Step 10: Erect covering and finish

Testing-for-completion-before-covering-300x208.jpg
Erection-covering-and-finisher-1-300x225.jpg
Erection-wall-cladding-1-300x200.jpg
bottom of page